{"id":11695,"date":"2022-10-04T13:58:47","date_gmt":"2022-10-04T17:58:47","guid":{"rendered":"https:\/\/energiesnet.com\/espanol\/?p=11695"},"modified":"2022-10-04T13:58:52","modified_gmt":"2022-10-04T17:58:52","slug":"vinci-consigue-millonarios-contratos-en-lineas-de-alta-tension-en-brasil-afp","status":"publish","type":"post","link":"https:\/\/energiesnet.com\/espanol\/vinci-consigue-millonarios-contratos-en-lineas-de-alta-tension-en-brasil-afp\/","title":{"rendered":"Vinci consigue millonarios contratos en l\u00edneas de alta tensi\u00f3n en Brasil &#8211; AFP"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/energiesnet.com\/espanol\/wp-content\/uploads\/2022\/10\/vince_anual_meeting-afp.jpg\" alt=\"\" class=\"wp-image-11696\" srcset=\"https:\/\/energiesnet.com\/espanol\/wp-content\/uploads\/2022\/10\/vince_anual_meeting-afp.jpg 600w, https:\/\/energiesnet.com\/espanol\/wp-content\/uploads\/2022\/10\/vince_anual_meeting-afp-300x200.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption>Imagen de una asamblea general del grupo Vinci tomada el 17 de abril de 2019 en Par\u00eds\u00a0 (AFP)  <\/figcaption><\/figure>\n\n\n\n<p>AFP  <\/p>\n\n\n\n<p>PARIS  <br>EnergiesNet.com 04 101 2022  <\/p>\n\n\n\n<p>El gigante franc\u00e9s de obras p\u00fablicas Vinci anunci\u00f3 el lunes haber obtenido dos contratos por valor de 1.000 millones de euros (USD 980 millones) en total por dos l\u00edneas de alta tensi\u00f3n en Brasil, uno de ellos incluyendo un per\u00edodo de explotaci\u00f3n y de mantenimiento de 30 a\u00f1os<\/p>\n\n\n\n<p>Firmados por la filial Cobra IS, comprada en 2021 al grupo espa\u00f1ol ACS, estos contratos incluyen la concepci\u00f3n y la construcci\u00f3n de m\u00e1s de 2.000 km de l\u00edneas de transmisi\u00f3n as\u00ed como de varias estaciones, m\u00e1s de la mitad en el Estado de Minas Gerais (sudeste)<\/p>\n\n\n\n<p>Uno de los contratos estipula la explotaci\u00f3n y el mantenimiento durante 30 a\u00f1os de 1.080 km de l\u00ednea, por valor de 3.480 millones de reales (670 millones de euros)<\/p>\n\n\n\n<p>Las obras, que movilizar\u00e1n \u00aba m\u00e1s de 5.000 empleados\u00bb, deben terminar a fines de 2027, precisa el grupo<\/p>\n\n\n\n<p>En Espirito Santo, 4.900 empleados de Vinci construir\u00e1n, tambi\u00e9n antes de fin de 2027, 980 km de l\u00edneas por 2.000 millones de reales (386 millones de euros).<\/p>\n\n\n\n<p>La actividad internacional representa ahora m\u00e1s del total de la mitad de las operaciones de Vinci, que obtuvo en el primer semestre un beneficio neto de 1.900 millones de euros, superior al per\u00edodo prepand\u00e9mico y m\u00e1s del doble respecto a 2021. Su volumen de negocio aument\u00f3 un 26% a 28.500 millones de euros.<\/p>\n\n\n\n<p>La adquirida Cobra IS ya hab\u00eda instalado \u00abunos 32.000 km de l\u00edneas el\u00e9ctricas\u00bb en Brasil en 20 a\u00f1os.<\/p>\n\n\n\n<p>El grupo Vinci espera obtener un resultado neto en 2022 superior al nivel de 2019<\/p>\n\n\n\n<p>afp.com 03 10 2022<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AFP PARIS EnergiesNet.com 04 101 2022 El gigante franc\u00e9s de obras p\u00fablicas Vinci anunci\u00f3 el lunes haber obtenido dos contratos por valor de 1.000 millones de euros (USD 980 millones) en total por dos l\u00edneas de alta tensi\u00f3n en Brasil, uno de ellos incluyendo un per\u00edodo de explotaci\u00f3n y de mantenimiento de 30 a\u00f1os Firmados &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/energiesnet.com\/espanol\/vinci-consigue-millonarios-contratos-en-lineas-de-alta-tension-en-brasil-afp\/\"> <span class=\"screen-reader-text\">Vinci consigue millonarios contratos en l\u00edneas de alta tensi\u00f3n en Brasil &#8211; AFP<\/span> Leer m\u00e1s &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":11696,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-11695","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias-diarias"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/posts\/11695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/comments?post=11695"}],"version-history":[{"count":0,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/posts\/11695\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/media\/11696"}],"wp:attachment":[{"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/media?parent=11695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/categories?post=11695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energiesnet.com\/espanol\/wp-json\/wp\/v2\/tags?post=11695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}