12/23 Closing Prices / revised 12/24/2024 07:33 GMT |  12/19 OPEC Basket  $72.88 –$0.45 cents 12/23 Mexico Basket (MME)  $64.51 –$0.18 cents   11/30 Venezuela Basket (Merey)  $59.58   +$1.28 cents  12/23 NYMEX Light Sweet Crude  $69.24-$0.22 cents | 12/23 ICE Brent $72.33 -$0.21 cents 12/23 Gasoline RBOB NYC Harbor  $1.9383 –0.0033 cents | 12/23 Heating oil NY Harbor  $2.263 -0.0054 cents | 12/23 NYMEX Natural Gas  $3.636 -0.092 cents | 12/20 Active U.S. Rig Count (Oil & Gas) 589 = 0| 12/24 USD/MXN Mexican Peso  $20.1799 (data live) 12/24 EUR/USD Dollar  $1.0397 (data live) | 12/26 US/Bs. (Bolivar)  $51.64000000 (data BCV) | Source: WTRG/MSN/Bloomberg/MarketWatch/Reuters

Argentina’s Shale-Gas Pipe Project Clouded by Political Scandal -Bloomberg

Aerial view of a gas deposit near Fortin de Piedra in Anelo, Neuquen province, Argentina, in the Vaca Muerta Formation, on November 27, 2019.(AFP).
LNG export hopeful needs trunk line to tap a vast shale patch. Fresh delays likely after allegations of corruption in tender.

Jonathan Gilbert, Bloomberg News

BUENOS AIRES
EnergiesNet.com 06 14 2022

 A proposed cross-country pipeline that would unlock Argentina’s vast natural gas reserves has been ensnared in political controversy and a legal investigation that may delay construction and worsen energy shortages.

Plans for the $1 billion conduit to begin hauling gas by next year’s Southern Hemisphere winter are unraveling after a top government official alleged there was corruption in a tender to supply steel pipes. That official, Production Minister Matias Kulfas, was subsequently forced out by President Alberto Fernandez, and a federal prosecutor and judge are now investigating the allegations.

The pipeline — which would stretch more than 400 miles (645 kilometers) from the Vaca Muerta shale zone in Patagonia to the province of Buenos Aires — is key to weaning Argentina off costly gas imports and unlocking the nation’s potential to become a major exporter of the fuel. It now faces fresh delays because it’s unclear how long the legal investigation will take and whether companies will want to bid to build it amid the political wrangling.

State-controlled Energia Argentina SA is pushing ahead with a second tender to design and build the pipeline. After a unit of Tenaris SA was the sole bidder in an earlier tender for pipes, Chief Executive Officer Paolo Rocca told a gathering of business leaders that there was “no corruption” afoot.

Energia Argentina also said there was nothing corrupt in the process. Kulfas was summoned to court on June 10, where he toned down allegations and said his original comments were part of arguments between rival government factions rather than charges of wrongdoing, according to news reports.

“With the courts getting involved, it’s very likely that in winter 2023 we’ll end up paying $28 for natural gas instead of $4,” Rocca said during the June 7 event in Buenos Aires. 

This is Argentina’s second attempt to build the pipeline that drillers need so they can expand output in the Vaca Muerta. The first began about three years ago under the previous government of Mauricio Macri.

After woeful Argentine credit conditions killed that project, the current administration took two years to draw up a new process in which it decided to pay for the pipeline itself.

“Instead of seizing the moment — this global demand opportunity amid the misfortune of the Russia-Ukraine war — Argentina is suffering it,” said Nicolas Gadano, an Argentine consultant and university professor who specializes in the intersection of economics and energy.

The new setback is amplifying Argentina’s broader gas “failure,” Gustavo Lopetegui, the Macri-era official originally tasked with the pipeline, wrote in a June 9 column in La Nacion newspaper. “These serious mistakes will produce gas shortages, cutoffs in winter, and dollar outflows to pay for imports.

bloomberg.com 06 13 2022

Share this news


 EnergiesNet.com

About Us

 

By Elio Ohep · Launched in 1999 under Petroleumworld.com

Information & News on Latin America’s Energy, Oil, Gas,
Renewables, Climate, Technology, Politics and Social issues

Contact : editor@petroleuworld.com


CopyRight©1999-2024, Petroleumworld.com
, EnergiesNet.com™  /
Elio Ohep – All rights reserved
 

This site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use’, you must obtain permission fromPetroleumworld or the copyright owner of the materia

 

Energy - Environment

No posts found!

Point of View

EIA Total Energy Review
This Week in Petroleum