The elected president of Venezuela Edmundo González Urrutia had to flee to Spain and is currently in exile in that country after the regime issued an arrest warrant against him for subversion. González Urrutia obtained 67% of the votes in the election day of July 28, against 30% for Nicolás Maduro with 83.5% of the votes verified with published tally sheets, winning in all states (source: resultadosconvzla.com). We reject the arrest warrant, and the fraud intended by the National Electoral Council – CNE of Venezuela, proclaiming Nicolás Maduro as president-elect for a new presidential term and its ratification by the Supreme Court of Justice-TSJ, both without showing the voting minutes or any other support.  EnergiesNet ” Latin America & Caribbean web portal with news and information on Energy, Oil, Gas, Renewables, Engineering, Technology, and Environment.– Contact : Elio Ohep, editor at  EnergiesNet@gmail.com +584142763041-   The elected president of Venezuela Edmundo González Urrutia had to flee to Spain and is currently in exile in that country after the regime issued an arrest warrant against him for subversion. González Urrutia obtained 67% of the votes in the election day of July 28, against 30% for Nicolás Maduro with 83.5% of the votes verified with published tally sheets, winning in all states (source: resultadosconvzla.com). We reject the arrest warrant, and the fraud intended by the National Electoral Council – CNE of Venezuela, proclaiming Nicolás Maduro as president-elect for a new presidential term and its ratification by the Supreme Court of Justice-TSJ, both without showing the voting minutes or any other support.
10/01 closing Prices  / revised 10/02/2024  08:16 GMT | 10/01 OPEC Basket $71.34 –$1.66 cents | 09/30 Mexico Bascket (MME)  $63.76 –$0.04 cents (The MME price is not published today due to Tuesday’s presidential inauguration day.)  08/31 Venezuela Basket (Merey)  $62 15   +$1.66 cents 10/01 NYMEX Light Sweet Crude $69.63 +$0.01 cents | 10/01 ICE Brent Sept $73.56 +$1.86 cents | 10/01 Gasoline RBOB NYC Harbor $1.9966 +0.0315 cents | 10/01 Heating oil NY Harbor  $2.1742 +0.0198 cents | 10/01 NYMEX Natural Gas  $2.896 -0.027 cents | 09/27 Active U.S. Rig Count (Oil & Gas) 587 -1 | 10/02 USD/MXN Mexican Peso 19.6214 (data live) 10/02 EUR/USD  1.1072 (data live) | 10/02 US/Bs. (Bolivar)  $36.91870000 (data BCV) | Source: WTRG/MSN/Bloomberg/MarketWatch

Exxon to build its own onshore base for Guyana’s Yellowtail Project

ExxonMobil

By Kaieteur News

GEORGETOWN
Petroleumworld 12 15 2021

Esso Exploration and Production Guyana Limited (EEPGL)—ExxonMobil Guyana—is planning to build its own shore-base to service its fourth development in the Stabroek Block, Yellowtail, despite the fact it is yet to obtain any permits from the Guyana Government.

The disclosure was made this past week by ExxonMobil Guyana President, and Country Manager, Alistair Routledge, during his address to the 231nd Georgetown Chambers of Commerce and Industry’s (GCCI) Award Ceremony which boasted the presence of top local private sector officials.

Also present in the audience were Vice President Bharrat Jagdeo and Subject Minister, Vickram Bharrat.

The announcement was made a week before the promised Local Content Legislation is tabled in the National Assembly.

Addressing the private sector representatives in attendance, the EPPGL official used the occasion to disclose that the company has in fact been relocating its supply chain services to Guyana from neighbouring Trinidad and Tobago.

He said that this was the case with a number of contractors engaged in the operations with the ExxonMobil led consortium that are currently relocating their supply centres to Guyana.

Reminding his listeners that the company is currently in discussions with the Guyana Government with regard to approval for the Yellowtail development, Routledge said the company will be looking to build a shore base to cater for that facility.

Guyana currently boasts one shore base facility, with another on the cards for construction.

Addressing the GCCI gala affair, the ExxonMobil Guyana President said, “as you know, we are currently in discussions with the Government regarding the field development plan for the Yellowtail Project.”

He was at the time emphasizing the role of the private sector in the development of Guyana, and pointed to the operations in the Stabroek Block which, he said, provides a foundation for that growth in domestic capacity.
Reminding of the potential for up to 10 developments in the Stabroek Block, the ExxonMobil Guyana President said that this bodes enormous potential not just for the contractors engaged already, but a host of others.

As such, he disclosed that “to date all of the major international oil and gas contractors have a presence in Guyana and have steadily been moving activities from the United States, Brazil, Trinidad and Tobago to Guyana.”

According to Routledge, “almost the entire supply chain for our offshore activities has been relocated to Guyana.”

This, he said, “has created opportunities for the Guyanese private sector, whether it’s to build out the shore-bases, warehousing, (or) waste treatment facilities.”

To this end, Routledge disclosed that “as we look forward to the projects to come” the company plans to “as part of the Yellowtail Project, we also plan to invest in a project shore-base that will enable an increase in fabrication and load out activities in Guyana.”

According to Routledge the consortium has to date already pumped some US$30B into its operations in the Stabroek Block, with regard to the development of the Liza I, II, Payara and Yellowtail Projects, thus far.

According to Routledge, with the Liza I field producing since December 2019, the second Floating Production Storage and Offloading (FPSO) vessel will come on stream in the New Year, tripling production for Guyana.

The Payara Development, which he said was approved by Government last year, is expected to begin production in 2023.

He was adamant that the money pumped into the Stabroek Block by ExxonMobil will generate billions in revenue in coming years.

Routledge used the occasion to remind that the company has a scope for up to 10 developments in the Stabroek Block in future and pointed to the five discoveries to articulate “who knows where this could go.”

With the oil major boasting of some US$30B being pumped into Guyana, it is poignant to note that Government has, through its failure to audit bills submitted, to pay some US$11B for the Liza I & II projects, in addition to pre-contract costs.

It would mean that ExxonMobil has been deducting money out of cost oil to service those payments, none of which was ever checked and verified by the Guyana Government.

This past month, the political opposition had called the failure on the part of the administration, a dereliction of duty.

Vice President Bharrat Jagdeo, during a recent press briefing, had said the Government is disappointed that it has not been able to push through with critical audits, which cover over US$9B in expenditure for the Stabroek Block’s Liza Phase One and Two Projects.

The Vice President said, “…we have been very disappointed that we have not been able to select a group to do the audit of the post-2017 expenditure by Exxon. The reason is that we didn’t have strong local content. We had two groups, two local groups that came in, but they were not strong enough. We want to build the capacity in Guyana to do this audit. We think that our people have enormous skills, forensic skills and auditing capacity.”

The former President added, “…we’re looking to see if we can’t have an arrangement, where we have a consortium of our local people to come together to do part of this work, while working alongside an international group.”
That position, however, was roundly rejected by a number of civil society organizations, among others.

_____________

By Kaieteur News

kaieteurnews.com 
12 14 2021

Copyright ©1999-2021 Petroleumworld or respective author or news agency. All rights reserved.

Petroleumworld.com Copyright ©2021 Petroleumworld.

Share this news

Support EnergiesNet.com

By Elio Ohep · Launched in 1999 under Petroleumworld.com

Information & News on Latin America’s Energy, Oil, Gas, Renewables, Climate, Technology, Politics and Social issues

Contact : editor@petroleuworld.com


CopyRight©1999-2021, EnergiesNet.com™  / Elio Ohep – All rights reserved
 

This site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use’, you must obtain permission fromPetroleumworld or the copyright owner of the material.