01/10 Closing Prices / revised 01/10/2025 21:59 GMT  01/09 OPEC Basket  $76.13 –$0.80 cents | 01/10 Mexico Basket (MME)  $71.46 +$2.65 cents   11/30 Venezuela Basketc (Merey)  $59.58   +$1.28 cents  01/10 NYMEX Light Sweet Crude  $76.56   +$2.65 cents | 01/10 ICE Brent  $79.76 +$2.84 cents |  01/10 Gasoline RBOB NYC Harbor  $2.07 +2.3% 01/10 Heating oil NY Harbor  $2.50 +5.2%| 01/10 NYMEX Natural Gas $3.99   +7.8% | 01/10 Baker Hughes Rig Count (Oil & Gas) 584 -6 | 01/10 USD/MXN Mexican Peso    $20.7161 (data live) | 01/10 EUR/USD Dollar $1.0244 (data live) | 01/14 US/Bs. (Bolivar)  $53.87910000 (data BCV) | Source: WTRG/MSN/Bloomberg/MarketWatch/Reuters

OnCorp selected to build Brazil LNG terminal – Argus

OnCorp to build an LNG regasification terminal at Suape port in Pernambuco, Brazil

Argus Media

RIO
EnergiesNet.com 10 21 2022

Brazil’s OnCorp was selected to build an LNG regasification terminal at Suape port in Pernambuco, which will be used by Shell to supply imported natural gas to state-controlled distributor Copergas.

The port, which is controlled by the Pernambuco state government, chose OnCorp to install the terminal from among five bids in a public tender.

The project includes a floating storage and regasification unit (FSRU) to be located at an existing mixed-use pier in the port, which should result in faster construction than building offshore. OnCorp in its proposal last year said it already has a leasing contract for an FSRU.

The project will require investments of R220mn ($42mn) and will have the capacity to import 4mn-9mn m³/d of natural gas. The Pernambuco government believes the terminal has potential to become an LNG import hub for northeastern Brazil, and Copergas plans to market gas from the terminal to northeastern consumers.

OnCorp plans to connect the terminal to Copergas’ gas distribution network. In late 2020, Shell agreed to supply Copergas with 750,000 m³/d of gas in 2022 and 1mn m³/d in 2023. Shell has an agreement with OnCorp to use the terminal.

The terminal also has the potential to be connected to the Transportadora Associada de Gas’ (TAG) gas transport grid.

OnCorp has agreed to pay R6.3mn to the state government to lease the pier for 48 months.

argusmedia.com 10 20 2022

Share this news

Leave a Comment


 EnergiesNet.com

About Us

 

By Elio Ohep · Launched in 1999 under Petroleumworld.com

Information & News on Latin America’s Energy, Oil, Gas,
Renewables, Climate, Technology, Politics and Social issues

Contact : editor@petroleuworld.com


CopyRight©1999-2024, Petroleumworld.com
, EnergiesNet.com™  /
Elio Ohep – All rights reserved
 

This site is a public free site and it contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.We are making such material available in our efforts to advance understanding of business, environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have chosen to view the included information for research, information, and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use’, you must obtain permission fromPetroleumworld or the copyright owner of the materia

 

Energy - Environment

No posts found!

Point of View

EIA Total Energy Review
This Week in Petroleum